Details

The JCT Design and Build Contract 2005


The JCT Design and Build Contract 2005


3. Aufl.

von: David Chappell

98,99 €

Verlag: Wiley-Blackwell
Format: PDF
Veröffentl.: 15.04.2008
ISBN/EAN: 9780470759745
Sprache: englisch
Anzahl Seiten: 288

DRM-geschütztes eBook, Sie benötigen z.B. Adobe Digital Editions und eine Adobe ID zum Lesen.

Beschreibungen

The Joint Contracts Tribunal issued a new Design and Build Form in 2005, a successor to the JCT Standard Form of Building Contract with Contractor’s Design. It looks substantially different from its predecessor and it is different in structure and often in its wording.<br /> <p>This major new edition of David Chappell’s well regarded book has been substantially revised to take account of the new contract terms and different structure. It also considers the standard novation agreements from the CIC and City of London Law Society and more then 70 additional cases.<br /> <br /> It discusses areas where problems frequently arise:</p> <ul> <li> <div>the allocation of design responsibility</div> </li> <li> <div>discrepancies</div> </li> <li> <div>the role of the employer’s agent</div> </li> <li> <div>payment provisions</div> </li> <li> <div>the approval of drawings</div> </li> </ul>
Preface. <p><b>1. INTRODUCTION.</b></p> <p>1.1 Definitions.</p> <p>1.2 Advantages and disadvantages.</p> <p>1.3 The architect's role.</p> <p>1.4 Standard forms available.</p> <p>1.5 Tendering procedures.</p> <p><b>2. CONTRACT DOCUMENTS.</b></p> <p>2.1 The documents.</p> <p>2.2 Completing the form.</p> <p>2.3 Employer's Requirements.</p> <p>2.4 Contractor's proposals.</p> <p>2.5 Contract sum analysis.</p> <p>2.6 Supplementary provisions.</p> <p>2.7 Priority, discrepancies, errors.</p> <p>2.8 Custody and copies.</p> <p>2.9 Notices.</p> <p><b>3. DESIGN LIABILITY.</b></p> <p>3.1 General principles of design liability.</p> <p>3.2 Liability under the contract.</p> <p>3.3 Design liability optional arrangements and consequences.</p> <p>3.4 Consultant switch and novation.</p> <p>3.5 Novation agreements.</p> <p>3.6 In house or sub let.</p> <p>3.7 Consultant warranties.</p> <p><b>4. THE CONTRACTOR'S OBLIGATIONS.</b></p> <p>4.1 Express and implied terms.</p> <p>4.2 Implied terms.</p> <p>4.3 Express terms.</p> <p>4.4 Other obligations.</p> <p><b>5. THE EMPLOYER'S POWERS AND DUTIES.</b></p> <p>5.1 Employer's agent.</p> <p>5.2 Express and implied terms.</p> <p>5.3 Instructions.</p> <p>5.4 Powers.</p> <p>5.5 Employer's duties.</p> <p><b>6. SUB CONTRACTORS AND SUPPLIERS.</b></p> <p>6.1 General.</p> <p>6.2 Sub contractors.</p> <p>6.3 Statutory requirements.</p> <p>6.4 The Construction (Design and Management) Regulations 2007.</p> <p>6.5 Work not forming part of the contract.</p> <p>6.6 Third party rights and collateral warranties.</p> <p><b>7. POSSESSION, PRACTICAL COMPLETION AND RECTIFICATION.</b></p> <p>7.1 Possession and deferment.</p> <p>7.2 Progress.</p> <p>7.3 Practical completion.</p> <p>7.4 Partial possession.</p> <p>7.5 Defects liability period.</p> <p><b>8. EXTENSION OF TIME.</b></p> <p>8.1 Principles.</p> <p>8.2 Contract procedure.</p> <p>8.3 Relevant events.</p> <p>8.4 Liquidated damages.</p> <p><b>9. FINANCIAL CLAIMS.</b></p> <p>9.1 Types of claim.</p> <p>9.2 Application for direct loss and/or expense.</p> <p>9.3 Supplementary provision procedures (S7).</p> <p>9.4 Grounds for direct loss and/or expense.</p> <p>9.5 Antiquities.</p> <p><b>10. PAYMENT.</b></p> <p>10.1 The contract sum.</p> <p>10.2 Interim payments.</p> <p>10.3 Applications.</p> <p>10.4 Employer's right to withhold payment or to deduct.</p> <p>10.5 Retention.</p> <p>10.6 Final payment.</p> <p>10.7 Advance payment.</p> <p>10.8 Changes.</p> <p>10.9 Valuation of changes under the supplementary provisions.</p> <p>10.10 Fluctuations.</p> <p>10.11 VAT.</p> <p><b>11. INSURANCE AND INDEMNITIES.</b></p> <p>11.1 Injury to persons and property.</p> <p>11.2 Employer's liability.</p> <p>11.3 Insurance of the Works.</p> <p>11.4 Insurance of the Works: new building.</p> <p>11.5 Insurance of the Works: existing building.</p> <p>11.6 Terrorism cover.</p> <p>11.7 The Joint Fire Code.</p> <p>11.8 Professional indemnity insurance.</p> <p><b>12. TERMINATION.</b></p> <p>12.1 Common law position.</p> <p>12.2 Termination generally.</p> <p>12.3 Termination by the employer.</p> <p>12.4 Termination by the contractor.</p> <p>12.5 Termination by either party.</p> <p><b>13. DISPUTE RESOLUTION</b>.</p> <p>13.1 Introduction.</p> <p>13.2 Adjudication.</p> <p>13.3 Arbitration.</p> <p>13.4 Litigation.</p> <p>Table of cases.</p> <p>Clause index.</p> <p>Subject index.</p>
"A thoroughly good read and exceptionally good guidance on the latest JCT design and build contact. I would thoroughly recommend this book to any of the parties for whom it was intended." (<i>Expert and Dispute Resolver</i>, Winter 2008) <br /> <p>"an immensely competent book which every site owner and contractor should read before entering into the contract" (<i>Construction Law Digest</i>)</p> <p>"well illustrated and easy to read" (<i>Chartered Surveyor Monthly</i>)</p> <p>"an enjoyable and essential read for professionals and lawyers involved in design & build" (<i>Building Magazine</i>)</p> <p>"a first rate commentary on JCT 98 With Contractor's Design." (<i>Construction Law</i>)</p>
<b>David Chappell</b> BA(Hons Arch), MA(Arch), MA(Law), PhD, RIBA has worked as an architect in the public and private sectors and is currently the Director of David Chappell Consultancy Ltd. He frequently acts as an adjudicator and is author of ten books on construction law for Blackwell Publishing.
The Joint Contracts Tribunal issued a new Design and Build Form in 2005, a successor to the JCT Standard Form of Building Contract with Contractor’s Design. It looks substantially different from its predecessor and it is different in structure and often in its wording.<br /> <p>This major new edition of David Chappell’s well regarded book has been substantially revised to take account of the new contract terms and different structure. It also considers the standard novation agreements from the CIC and City of London Law Society and more then 70 additional cases.<br /> <br /> It discusses areas where problems frequently arise:</p> <ul> <li> <div>the allocation of design responsibility</div> </li> <li> <div>discrepancies</div> </li> <li> <div>the role of the employer’s agent</div> </li> <li> <div>payment provisions</div> </li> <li> <div>the approval of drawings</div> </li> </ul>
About the last edition:<br /> <p>"an immensely competent book which every site owner and contractor should read before entering into the contract" - <b>Construction Law Digest</b><br /> </p> <p>"well illustrated and easy to read" - <b>Chartered Surveyor Monthly</b><br /> </p> <p>"an enjoyable and essential read for professionals and lawyers involved in design & build" - <b>Building Magazine</b><br /> </p> <p>"a first rate commentary on JCT 98 With Contractor's Design." - <b>Construction Law</b></p>

Diese Produkte könnten Sie auch interessieren:

Finite-Elemente-Methoden im Stahlbau
Finite-Elemente-Methoden im Stahlbau
von: Rolf Kindmann, Matthias Kraus
PDF ebook
52,99 €
Stahlbau
Stahlbau
von: Rolf Kindmann
PDF ebook
52,99 €
Bauphysik - Klima Wärme Feuchte Schall
Bauphysik - Klima Wärme Feuchte Schall
von: Peter Häupl
PDF ebook
34,99 €